KITCHENS


This kitchen was stripped to the bare bones before starting. Structural work included removing some non-load bearing walls to open the area and expand the kitchen. A new patio door was put in to replace a single door. A beautiful new floor was installed prior to the kitchen installation. Subway tiles and baseboard and window trims finished it off. The job required electrical and plumbing trades and kitchen installer.

AFTER
BEFORE

Paying attention to the details is my specialty. Every project is built to last and no corners are cut. The consultations with the customer ensures that the project is completed as expected within their budget.

Other Kitchen Projects

Doing it right everytime!